Toilet renovation: to start

The bathroom is an area with unique states: high humidity, temperature differences. That’s why making fixes in the restroom, you should definitely plan the whole operating process, to consider the sequence of steps to be achieved. In the following guide, you will learn where to begin the repair in the bathroom and what sorts of work ought to be carried out with your hands. Step-by-step directions for toilet repair

Stage 1: drawing up a plan and picking a layout solution.

Repair in the toilet can be of two types:

  • Unplanned, spontaneous, originating from the will of unforeseen conditions. By way of instance, in case of an pipe burst, flooding with neighbors.
  • Planned, which can be either capital or cosmetic. It requires preparation, serious monetary investment and time.

Begin repairs at the toilet is to ascertain the plan, interior. Think through to the last detail, what’s going to be the space, choose a colour. Pastel colors are traditional, in addition to a blend of blue and blue, or cherry with beige.

Begin repairs in the toilet is to determine the plan, interior layout. Consider detail, what will be the space, pick a colour. Pastel colors are deemed traditional, in addition to a combination of colours.

The next point is that the option of facing material. Usually, finishing at the bathroom is performed with tile, porcelain tiles, mosaic, plastic panels. Examine the plumbing, if it ought to be replaced. If necessary, pick the right choice. Proceed to the measuring function: step all sides, calculate the area of the area. Based on these information, we mark the location of these plumbing fittings.

Step 2: the selection of sanitary fixtures and substance for completing.

It is very important to see that the purchase of sanitary ware simplifies the preparation stage, and not vice versa. This usually means that first we develop a design project, create a plan, and then go to the shop. Yet another thing – you should specify the size of your favorite plumbing fittings and check the plan, whether it matches.

It is very important to understand that the cost of plumbing fixtures is completed by a preparation stage, rather than vice versa. This means that first we develop a design project, make a plan, then go to the store. Another one

As for stuff for finishing, it’s better to buy them instantly for the whole repair cycle, in order that then you will not be diverted if something has been missing. Remember about preparing the necessary tools.

Measure 3: dismantling tiling and plumbing.

Once all the preliminary work is completed, move on to the Start of the work process:

  • Eliminate the sink and tub from the area, even if they will not be replaced with new ones. In this manner, you can keep them clean and intact.
  • Eliminate the old tile, cleaning after it all surfaces: walls, ceiling, flooring.
  • Remove old paint from the walls, even if they were previously painted, because the glue alternative or a fresh layer of paint will not stick to surface.

Measure 4: replacement of communications: pipes, electric wiring.

Very often in an old home, you ought to carefully inspect and vsyakuhnya.ru replace not just the pipes which are in the toilet itself, but also the main riser, and sometimes the interfloor plumbing. What’s it worth doing so? Old pipes at any time may give a leak, then the new fix is going to be emptied, it is going to require extra investment to get rid of flaws.